**项目地下连续墙工程工程量汇
项目名称桩径(m)桩顶标高地面标高桩底标高桩长(m)桩型桩数砼方量(m3)1-16幅17幅18-22幅23幅24幅25幅54幅55幅56幅57-59幅60幅小计27/28/51/53幅26幅29幅30幅31幅32幅33/46幅34/36-40/43幅35幅41幅42幅44幅45幅47幅48幅49幅50幅52幅61幅62副小计80080080080080080080080080080080080080080080080080080080080080080080080080080080080080080080065.087635.84567.056357.32965.0525.9486.91676.4095.8435.8425.85.845.8455.8415.8445.8575.9665.23.0156.79466.5331.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.71.73.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.63.6-20-20-20-20-20-20-20-20-20-20-20-19-19-19-19-19-19-19-19-19-19-19-19-19-19-19-19-19-19-19-1921.721.721.721.721.721.721.721.721.721.721.720.720.720.720.720.720.720.720.720.720.720.720.720.720.720.720.720.720.720.720.71615111111313241111127111111111111301666.5688.31520.852.08101.47104.16122.39104.1652.08260.4127.233199.397.4483.6698.5114.53115.92106.13193.52677.297.1196.7196.7996.7396.76.9998.886.1149.93112.5199.36108.192922.91程量汇总表
成孔深度(m)成孔方量(M3)钢筋总重平均含钢量承载力设计(T)(kg/m3)值(KN)砼级配23.623.623.623.623.623.623.623.623.623.623.622.622.622.622.622.622.622.622.622.622.622.622.622.622.622.622.622.622.622.622.61812.46.04566.456.110.35113.28133.1113.2856.283.2138.373479.78433.9291.34107.54125.04126.56115.87211.28739.36106.02105.59105.68105.61105.66105.107.8794.0254.51122.84108.48118.123191.2176.94211.20755.2936.48712.53111.0615.41411.066.48728.53915.04350.07.5811.87813.40213.313.4912.49122.99980.48811.62711.49811.50111.49911.50111.62311.6710.4778.14615.03211.514.497356.658C30C30